Finally got that last torsion bar installed into the beam. That took freaking forever to get the think in.. from start to finish it took maybe 4-5 hours of trying. Ofcourse the method that ended up working was to tape the leaves together, and bevel the ends.. and once they caught in the center was to pound it through.
This method worked, but it wasn't easy.
It took atleast half an hour to pound the bar through the beam.. and then end got mushroomed a bit. After a little bit of grinding.. HOPEFULLY everything is back to normal. The suspension adjusters were installed after that. They vary the height of the suspension about 1" lift to 3" lower. I set them to about 2" lower I think.
The pans were finally in a position to get painted as well. Here is the base coat of Rust Encapsulator. Next coat will be the glossy Chassis black.
Finally starting to look good.